Improvements to Galisteo Street Bridge
Dateca. 1934
Mediumgelatin silver print
Dimensions4 × 5 15/16 in. (10.1 × 15.1 cm)
ClassificationsPhotography
Credit LineAlbuquerque Museum, gift of Bonnie Holten
Object numberPA2022.030.074
DescriptionConstruction workers improve the Galisteo Street Bridge in Santa Fe, New Mexico. Concrete is poured from the top of the bridge into the frames below, beside a large drainage pipe. The pipe is laid beneath the bridge, in a ditch with piles of dirt on either side. A man walks across the bridge while another stops and watches the concrete mixer. The improvements being made are part of a project with the New Deal.On View
Not on viewca. 1935
ca. 1935
ca. 1934
ca. 1934
ca. 1934
ca. 1933
ca. 1950
ca. 1935
ca. 1935